- Home
- Government
- County Legislature
- Las Vegas Sands Nassau Coliseum Site Documents
- Sands DEIS Appendices
Sands DEIS Appendices
Appendix 2
- Appendix 2-1 - Proposed Conceptual Master Plan and Phasing Exhibit
- Appendix 2-2 - Site Plans
- Appendix 2-3 - MFM FGEIS Findings Statement and MFM Zoning District
- Appendix 2-4 - Town of Hempstead Town Board Resolutions for Nassau Events Center
- Appendix 2-5 - Proposed Lease
- Appendix 2-6 - Positive Declaration for Sands Integrated Resort Lease and Final Scope
- Appendix 2-7 - Proposed MF-IRD Zoning District
- Appendix 2-8 - Marriott Purchase and Sale Agreement
- Appendix 2-9 - Community Outreach Information
- Appendix 2-10 - Deed Restrictions and Encumbrances
Appendix 3
- Appendix 3.1-1 - Soil Mechanics Drilling Corp. Soil Borings
- Appendix 3.1-2 - Geotechnical Engineering Report
- Appendix 3.1-3 - ALTA-NSPS Land Title Survey
- Appendix 3.1-4 - Sands New York NC Environmental Considerations Memo
- Appendix 3.1-4 - Sands New York_NC_Phase I ESA_Final
- Appendix 3.1-4 - Sands New York_NC_Phase II ESI_Final
- Appendix 3.1-4a - Nassau Coliseum Phase II ESI Tables
- Appendix 3.1-5 - Sands New York LIM Environmental Considerations Memo
- Appendix 3.1-5 - Sands New York_LIM_Phase I ESA_Final
- Appendix 3.1-5 - Sands New York_LIM_Phase II ESI_Final
- Appendix 3.1-5a - Marriott Property Phase II ESI Tables
- Appendix 3.1-6 - Elevator Pit Investigation
- Appendix 3.1-7 - Limits of Disturbance Off-Site Traffic Mitigation
- Appendix 3.2-1 - Environmental Remediation Database - Mitchel Field Contamination Site
- Appendix 3.2-2 - NCDPW Existing Recharge Basin Tributary Areas and Capacities
- Appendix 3.2-3 - Correspondence with Town of Hempstead Water Department Regarding Water Availability
- Appendix 3.2-4 - Contamination Plumes and Toxic Sites with a One-Mile Radius
- Appendix 3.2-5 - NCDPW Sewer Availablity Correspondence
- Appendix 3.2-6 - Preliminary Stormwater Pollution Prevention Plan
- Appendix 3.2-7 - Stormwater Management Concept Correspondence
- Appendix 3.3-1 - Ecological Resources
- Appendix 3.3-2 - Shadow Assessment
- Appendix 3.3-3 - Landscaping and Planting Plan
- Appendix 3.4-1 - Town of Hempstead BZO Chapter 146.1 (MFM Zoning District)
- Appendix 3.4-2 - FAA Notice Criteria Tool Results
- Appendix 3.6-1 - NYSDEC Community Air Monitoring Meeting Notes and Correspondence
- Appendix 3.6-2 - Mobile Source Analysis
- Appendix 3.6-3 - Stationary Source Analysis
- Appendix 3.6-4 - Nassau County Department of Health Asthma Dashboard
- Appendix 3.7-1 - Supplemental Noise Study Data
- Appendix 3.9-1 - Local and Regional Socioeconomic Impact Data
- Appendix 3.10-2 - Life Safety Plans
- Appendix 3.11-1 - Site and Surrounding Area Photographs
- Appendix 3.11-2 - Digital Renderings
- Appendix 3.11-3 - Photosimulations
- Appendix 3.11-4 - Lighting and Photometrics Plans
- Appendix 3.11-5 - Architectural Renderings
- Appendix 3.11-6 - Representative Exterior Materials
- Appendix 3.12-1 - Phase IA Literature Search and Archaeological Sensitivity Assessment
- Appendix 3.13-1 - Correspondence with Energy Providers and Energy Load Analysis
- Appendix 3.13-2 - Total Site Energy Analysis
- Appendix 3.14-1 - GHG Emissions Calculations
- Appendix 3.15-2 - Construction Correspondence
- Appendix 3.15-1 - Construction Logistics Plans
- Appendix 3.15-3 - Limited Asbestos Inspection Report
Appendix 3.5-1
- Traffic Impact Study
- Attachment A - Conceptual Master Plan
- Attachment B - TMC Data Final
- Attachment C - ATR Data
- Attachment D - Intersection Descriptions
- Attachment E - Figures
- Attachment F - Parkway Peak Hour Traffic Volumes
- Attachment G - Public Transportation
- Attachment H - Crash Data
- Attachment I - Agency and Municipal Correspondence (OPD)
- Attachment J - Trip Generation Calculations
- Attachment K - Trip Distribution
- Attachment L - LOS Definitions
- Attachment M - LOS Summary Tables
- Attachment N - Capacity Analysis-FB
- Attachment O - Meadowbrook State Parkway Vissim Analysis
- Attachment P - Roadway Improvements
- Attachment Q - Capacity Analysis - Phase 1
- Attachment R- Alternative Analysis
- Attachment S - Signal Timing and Phasing
- Attachment T - Signal Warrant Analysis
- Attachment U - Parking Analysis